Entity: UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED (UETCL)

Contract name: PROTECTION OF TOWER NO.5 ON LUGOGO KAMPALA NORTH 132kv TRANSMISSION LINE (UETCL/WORKS/2017/00005)

Date: 23rd April, 2021-23rd July, 2021

Tasks:

  1. Site Preparation.
  2. Assembling gabions and placing hardcore into the baskets.
  3. Stone pitching in and around the tower.
  4. Downstream storm water channel construction.
  5. Filling with murram, general cleaning works & demobilization.

Entity: UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED (UETCL)

Contract name: PROTECTION OF ENCROACHED TOWER NO.16 NAMANVE KAMPALA NORTH 132/33kV TRANSMISSION LINE (UETCL/works/2020-2021/00065)

Date: 28th September, 2021-6th November, 2021

Tasks:

  1. Setting out, Levelling and excavation.
  2. Concrete and steel works for the column bases, columns and beams.
  3. Stone Masonry works (stone pitching) in and around the tower.
  4. Earth works & other Drainage related works of the road access area beside the tower.

Entity: Uganda Revenue Authority (URA)

Contract name: Drainage and Compound works at Mutukula OSBP staff quarters (URA/CSD/WRKS/20-21/01671)

Date: May 2021 to Oct 2021

Tasks:

  1. Topographic surveys.
  2. Excavations and general earthworks.
  3. Construction of drainage trenches.
  4. Masonry & concrete works.
  5. General landscaping activities.
  6. Plumbing related works.

Entity: Elizabeth Glaser Pediatric AIDS Foundation (EGPAF)

Contract name: Lot 9. Renovation Works at Ngarama Health Centre III, Water and Drainage works and construction of placenta pits at Nyamuyanja Health Centre IV, Nyakitunda HC III, Kashumba Health Centre II and Kikokwa Health Centre III in Isingiro District

Date: 1/8/2020-May/2021

Tasks: Earth works, Construction of placenta pits of 3m dia and 3m deep, terrazzo works, fixing granite worktops 4no.of a total of 20sm, tiling works of about 270sm, roof covering of 220sm, fixing ceiling Expanded metal lathe of approx. 280sm and ceiling boards approx. 300sm, drainage and plumbing works of fixing sinks, water tanks of 10cm 4no. and steel stand tanks of 3cm .3no., painting over 2000sm.

Entity: Uganda Electricity Transmission Company (UETCL)

Contract name: Construction of a Police Post at Mabira

Date: 2020-Jan-2021

Tasks: Earth works, Construction of the police post structure with related civil works such as painting, masonry works, tiling etc, mechanical such as door and window installations and electrical works.

Entity: Rukiga Local Government

Contract name: Construction of Shooko Gravity Floor scheme in Rwamucucu sub-county

Tasks: Earth works, Construction of the concrete tanks that involved concrete and steel works, plumbing related works

Entity: Kabale District Local Government

Contract name: Phase II Construction of Rusisiro Gravity Flow Scheme in Butanda Sub county

Completion Date: Feb 2021

Tasks: Construction of public stand taps, pipe networking system, construction of sedimentation tank and Reinforced concrete tank

Entity: National Information Technology AuthorityUganda (NITA-U)

Contract name: Completion of the fencing of NITA-U land at Namanve Industrial Park

Date: 20th/2/2020- 5th/6/2020

Tasks: Building a block wall, Installation of a steel gate & Provision of water disposal channels

Entity: Uganda Electricity Transmission Company Limited (UETCL)

Contract name: Protection of Tower No.554 on Kampala North -Mutundwe 132kv Transmission Line at Mulago (UETCL/WORKS/2018- 19/00002)

Date: 2nd March 2020-30th April 2020

Tasks: Setting out, Levelling and excavation, Concrete works for the columns, Stone Masonry work for the walls and floor, Super structure construction (Cage welding works), Concrete works for drainage channels.

Entity: Kabale District Local Government

Contract name: Rehabilitation of Kyempogo GFS in Maziba Subcounty (KABA512/WRKS/20192020/00007)

Date: 16/1/2020-1/4/2020

Tasks: Demolitions & site clearance, Spring protection and pipe works/ Transmission mains, manhole construction and installation of fittings

Entity: Bank of Uganda (BOU)

Contract name: Repair works at Jinja regional branch (BOU/WRKS/17-18/00011)

Date: 14/February/2019-24/January,2020

Tasks: Civil works, Plumbing works & Electrical works

Entity: Bank of Uganda (BOU)

Contract name: Wall fence and other civil works at plot 8, Summit view- Kololo (BOU/WRKS/17-18/00005)

Date: 04/June/2018-11/June/2019

Tasks: Repair works on wall fence & Other civil works

Entity: Bank of Uganda (BOU)

Contract name: Renovation and refurbishment work at Bank of Uganda, Plot 45, Kampala road (BOU/WORKS/15-16/0012)

Date: 20/June/2016-15/June/2017

Tasks: Demolition works, Plumbing works, Supply and fixing of new doors and windows, Tiling & Painting works

Entity: Uganda Electricity Transmission Company Limited (UETCL)

Contract name: Contract for the protection of tower No.15 on Kampala North 132Kv Transmission line (UETCL/WORKS/2017/00011)

Date: 7/6/2019-25/9/2019

Tasks: Installation of gabions, Erection of a chain link fence, Construction of a water drainage channel, Civil & electrical insulation works

Entity: Uganda Bureau of Statistics (UBOS)

Contract name: Repair of leaking curtain walls at the main stair case and lift lobby areas (Phase 1) at Statistics House (UBOS-ADMIN/WRKS/2015- 2016/00042)

Date: Aug/2015-20th/November/2015

Tasks: Demolition works, Repairs and replacement of removed parts, Repairing leaking curtain walling, Modifications and rehabilitation of the stair case (9 stores) & the Lift lobby (9stores), Roof water proofing with APP Membrane, Painting, Rehabilitation of ceiling soft boards & Concrete works

Entity: MSF/EPICENTRE

Contract name: Rehabilitation Works on The Roof For; MSF/Epi-Centre Mbarara Office

Date: 03/10/2016-2nd December,2016

Tasks: Removal of the existing roofing tiles including ridges and valleys, Repair of wooden trusses, purlins, laying of 30-gauge plain sheet on the existing purlins, Supplying and re-fixing damaged roof tiles, ridges, wooden battens, Painting, Replacement of fascia boards, Roof gutters and Down delivery pipes.

Entity: Ministry of Water and Environment, DWD, WSDF-SWB

Contract name: Development of 2No. production wells for Rushere town water supply and sanitation system. (WSDF-SWB/WRKS/2013-2014/00006)

Date of Completion: October/2014

Tasks: Supply and installation of pumping mains, Supply and installation of 2No. 20K VA Generators and 4No. SP3A-45, Construction of 2No. pump houses and generator houses and Ecosan Toilets, Chain link fencing Grass planting

Entity: Ministry of Water and Environment, DWD, WSDF-SWB

Contract name: Source protection for Kainja RGC piped water supply and sanitation scheme (MWE-WSDF-SWB/WRKS/14-15/00005)

Date: 27/2/2015-8/6/2015

Tasks: Source development, Protection of 5No. wells, Fencing, Sedimentation tank construction & Tree planting