Client: Gamatui Secondary Sechool, Kapchworwa District

Description of Contract: Completion of the dormitory building

Technical details: Roofing works, Masonry walling, steel and concrete works.

Project duration: 12 months but to be done in less than 6 months

Project location: Kapchorwa

Client: Uganda Revenue Authority

Description of Contract: Completion of Malaba gate house

Technical details: Roofing, eml ceiling, masonry works, tiling, painting, electricals works, etc.

Project duration: 3 months

Project location: Malaba OSBP

Client: Uganda Revenue Authority

Description of Contract: Renovation of URA VURRA Office and staff quarters

Technical details: Demolition works, painting, Terrazzo and tiling works, electrical works and roof covering.

Project duration: 5 months

Project location: Vurra, Arua

Client: Bank of Uganda

Description of Contract: Repair works at plot 8 Summit View

Technical details: Demolition works, painting works, timber floor works, washroom and toilet repairs.

Project duration: 6 months

Project location: Plot 8, Summit View

Client: Bank of Uganda

Description of Contract: Additional Repair works at plot 8 Summit View

Technical details: Electricals & plumbing.

Project duration: 2 months

Project location: Plot 8, Summit View

Client: Bank of Uganda

Description of Contract: Parking and drive-way repairs at Branch manager’s residence at Kabale Branch

Technical details: Demolition works, Concrete & steel works, painting parking lot, razor wire installation,

Completion Date: 01st/04/2021

Client: Uganda Bureau of Statistics

Description of Contract: Construction of a garbage refuse centre at statistics House

Technical details: Demolition works, Block walling & general masonry works, concrete and steel works, steel gate fabrication and installation and painting.

Completion Date: January 2021

Client: Uganda Health Marketing Group (UHMG)

Description of Contract: Water proof membrane works to the UHMG head office block rooftop surface on the third-floor level (UHMG2020-100- 101)

Technical details: Demolition works, Roof slab tile removal, APP Membrane application, Tile fixing & Removal of Debris.

Completion Date: 5/3/2020- 28/5/2020

Client: Uganda National Roads Authority (UNRA)

Description of Contract: Provision and Installation of Fabrication work to UNRA

Technical details: Metal-barrier fabrication for the gate and concrete works.

Date: 24/2/2020-March/2020

Client: Uganda Electricity Generation Company Limited

Description of Contract: Emptying of Planters and waterproofing (UEGCL/NCONS/1920/00257) and Minor repairs, planter emptying, water proof, paint (UEGCL/WRKS/19-20/00007)

Technical details: Emptying planters, water proofing works and painting works.

Date: February 2020-March 2020

Client: Bank of Uganda

Description of Contract: Roof Repairs to the Breastfeeding Room at Plot 45, Kampala Road (BOU/WRKS/19-20/00006)

Technical details: Demolition works, Roof slab floor finishes (APP membrane application and tiling works), Steel fabrication works, painting works & Removal of debris.

Date: 6/2/2020-26/2/2020

Client: UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED (UETCL)

Contract name: PROTECTION OF TOWER NO.5 ON LUGOGO KAMPALA NORTH 132kv TRANSMISSION LINE (UETCL/WORKS/2017/00005)

Date: 23rd April, 2021-23rd July, 2021

Tasks:

  1. Site Preparation.
  2. Assembling gabions and placing hardcore into the baskets.
  3. Stone pitching in and around the tower.
  4. Downstream storm water channel construction.
  5. Filling with murram, general cleaning works & demobilization.

Client: UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED (UETCL)

Contract name: PROTECTION OF ENCROACHED TOWER NO.16 NAMANVE KAMPALA NORTH 132/33kV TRANSMISSION LINE (UETCL/works/2020-2021/00065)

Date: 28th September, 2021-6th November, 2021

Tasks:

  1. Setting out, Levelling and excavation.
  2. Concrete and steel works for the column bases, columns and beams.
  3. Stone Masonry works (stone pitching) in and around the tower.
  4. Earth works & other Drainage related works of the road access area beside the tower.

Client: Uganda Revenue Authority (URA)

Contract name: Drainage and Compound works at Mutukula OSBP staff quarters (URA/CSD/WRKS/20-21/01671)

Date: May 2021 to Oct 2021

Tasks:

  1. Topographic surveys.
  2. Excavations and general earthworks.
  3. Construction of drainage trenches.
  4. Masonry & concrete works.
  5. General landscaping activities.
  6. Plumbing related works.

Client: Elizabeth Glaser Pediatric AIDS Foundation (EGPAF)

Contract name: Lot 9. Renovation Works at Ngarama Health Centre III, Water and Drainage works and construction of placenta pits at Nyamuyanja Health Centre IV, Nyakitunda HC III, Kashumba Health Centre II and Kikokwa Health Centre III in Isingiro District

Date: 1/8/2020-May/2021

Tasks: Earth works, Construction of placenta pits of 3m dia and 3m deep, terrazzo works, fixing granite worktops 4no.of a total of 20sm, tiling works of about 270sm, roof covering of 220sm, fixing ceiling Expanded metal lathe of approx. 280sm and ceiling boards approx. 300sm, drainage and plumbing works of fixing sinks, water tanks of 10cm 4no. and steel stand tanks of 3cm .3no., painting over 2000sm.

Client: Uganda Electricity Transmission Company (UETCL)

Contract name: Construction of a Police Post at Mabira

Date: 2020-Jan-2021

Tasks: Earth works, Construction of the police post structure with related civil works such as painting, masonry works, tiling etc, mechanical such as door and window installations and electrical works.

Client: Rukiga Local Government

Contract name: Construction of Shooko Gravity Floor scheme in Rwamucucu sub-county

Tasks: Earth works, Construction of the concrete tanks that involved concrete and steel works, plumbing related works

Client: Kabale District Local Government

Contract name: Phase II Construction of Rusisiro Gravity Flow Scheme in Butanda Sub county

Completion Date: Feb 2021

Tasks: Construction of public stand taps, pipe networking system, construction of sedimentation tank and Reinforced concrete tank

Client: National Information Technology AuthorityUganda (NITA-U)

Contract name: Completion of the fencing of NITA-U land at Namanve Industrial Park

Date: 20th/2/2020- 5th/6/2020

Tasks: Building a block wall, Installation of a steel gate & Provision of water disposal channels

Client: Uganda Electricity Transmission Company Limited (UETCL)

Contract name: Protection of Tower No.554 on Kampala North -Mutundwe 132kv Transmission Line at Mulago (UETCL/WORKS/2018- 19/00002)

Date: 2nd March 2020-30th April 2020

Tasks: Setting out, Levelling and excavation, Concrete works for the columns, Stone Masonry work for the walls and floor, Super structure construction (Cage welding works), Concrete works for drainage channels.

Client: Kabale District Local Government

Contract name: Rehabilitation of Kyempogo GFS in Maziba Subcounty (KABA512/WRKS/20192020/00007)

Date: 16/1/2020-1/4/2020

Tasks: Demolitions & site clearance, Spring protection and pipe works/ Transmission mains, manhole construction and installation of fittings

Client: Bank of Uganda (BOU)

Contract name: Repair works at Jinja regional branch (BOU/WRKS/17-18/00011)

Date: 14/February/2019-24/January,2020

Tasks: Civil works, Plumbing works & Electrical works

Client: Bank of Uganda (BOU)

Contract name: Wall fence and other civil works at plot 8, Summit view- Kololo (BOU/WRKS/17-18/00005)

Date: 04/June/2018-11/June/2019

Tasks: Repair works on wall fence & Other civil works

Client: Bank of Uganda (BOU)

Contract name: Renovation and refurbishment work at Bank of Uganda, Plot 45, Kampala road (BOU/WORKS/15-16/0012)

Date: 20/June/2016-15/June/2017

Tasks: Demolition works, Plumbing works, Supply and fixing of new doors and windows, Tiling & Painting works

Client: Uganda Electricity Transmission Company Limited (UETCL)

Contract name: Contract for the protection of tower No.15 on Kampala North 132Kv Transmission line (UETCL/WORKS/2017/00011)

Date: 7/6/2019-25/9/2019

Tasks: Installation of gabions, Erection of a chain link fence, Construction of a water drainage channel, Civil & electrical insulation works

Client: Uganda Bureau of Statistics (UBOS)

Contract name: Repair of leaking curtain walls at the main stair case and lift lobby areas (Phase 1) at Statistics House (UBOS-ADMIN/WRKS/2015- 2016/00042)

Date: Aug/2015-20th/November/2015

Tasks: Demolition works, Repairs and replacement of removed parts, Repairing leaking curtain walling, Modifications and rehabilitation of the stair case (9 stores) & the Lift lobby (9stores), Roof water proofing with APP Membrane, Painting, Rehabilitation of ceiling soft boards & Concrete works

Client: MSF/EPICENTRE

Contract name: Rehabilitation Works on The Roof For; MSF/Epi-Centre Mbarara Office

Date: 03/10/2016-2nd December,2016

Tasks: Removal of the existing roofing tiles including ridges and valleys, Repair of wooden trusses, purlins, laying of 30-gauge plain sheet on the existing purlins, Supplying and re-fixing damaged roof tiles, ridges, wooden battens, Painting, Replacement of fascia boards, Roof gutters and Down delivery pipes.

Client: Ministry of Water and Environment, DWD, WSDF-SWB

Contract name: Development of 2No. production wells for Rushere town water supply and sanitation system. (WSDF-SWB/WRKS/2013-2014/00006)

Date of Completion: October/2014

Tasks: Supply and installation of pumping mains, Supply and installation of 2No. 20K VA Generators and 4No. SP3A-45, Construction of 2No. pump houses and generator houses and Ecosan Toilets, Chain link fencing Grass planting

Client: Ministry of Water and Environment, DWD, WSDF-SWB

Contract name: Source protection for Kainja RGC piped water supply and sanitation scheme (MWE-WSDF-SWB/WRKS/14-15/00005)

Date: 27/2/2015-8/6/2015

Tasks: Source development, Protection of 5No. wells, Fencing, Sedimentation tank construction & Tree planting